WO-2026-0034 · Gross Motor Play Gym — 4 Piece – Birch Demo Assembly · batch B-260174
xero synced 9:14 am 17 Aug 2026

WO-2026-0034

Complete Assembly

14 × Gross Motor Play Gym — 4 Piece – Birch · for SO-2026-0392 (Victory Primary School)

← Board
Planned Cut & machined On the bench Finishing Complete Due 31 Aug 2026
Pick list — 14 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
CodeMaterialRequired IssuedOn hand Unit costLine cost
MAT-BP18-BB Birch plywood 2440×1220 × 18mm BB/BB 35 sheet 35 166 $218.50 $7,647.50
MAT-BP12-BB Birch plywood 2440×1220 × 12mm BB/BB 15.4 sheet 15.4 15 $152.00 $2,340.80
MAT-BP06-BB Birch plywood 2440×1220 × 6mm BB/BB 12.6 sheet 12.6 9 $86.00 $1,083.60
MAT-BIR-EDG Birch edging tape 22mm, per lineal m 448 lm 448 2,011 $2.95 $1,321.60
FIN-OIL-CL Hardwax oil, clear, low-tox — per litre 11.06 L 11.06 79.43 $62.50 $691.25
FIN-SAND-120 Abrasive belt 120 grit 18.9 ea 18.9 29 $8.90 $168.21
HW-CONF-50 Confirmat screw 7×50 196 ea 196 12,195 $0.18 $35.28
HW-GLIDE Felt glide, screw-in 84 ea 84 644 $0.95 $79.80
PKG-CTN-L Carton, large, double wall 14 ea 14 754 $7.20 $100.80
PKG-CORNER Corner board, per lineal m 126 lm 126 1,362 $0.85 $107.10
Materials $13,575.94
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
WhenWhoBenchAt stageMinutesRate / hCost
10 Aug 2026, 12:50 pm Cam Bishop Assembly On the bench 2,264 $94.00 $3,546.93
13 Aug 2026, 11:10 am Anahera Wilson Sanding On the bench 1,307 $82.00 $1,786.23
14 Aug 2026, 1:50 pm Ellie Naumann Finishing Finishing 1,419 $98.00 $2,317.70
14 Aug 2026, 3:45 pm Pete Rasmussen Edging Cut & machined 1,003 $88.00 $1,471.07
17 Aug 2026, 2:00 pm Jess Mattingly CNC Router Cut & machined 2,515 $115.00 $4,820.42
Total 8,508 $13,942.35
What this actually costs to make
Materials plus the bench time, per unit
$1,965.59
each, over 14 in this batch
Materials
$13,575.94
Booked labour
$13,942.35
Batch cost
$27,518.29
List price each $1,765.00
Margin each -$200.59 · -11%

The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.

Where the time went
CNC Router 41 h 55 min $4,820.42
Assembly 37 h 44 min $3,546.93
Finishing 23 h 39 min $2,317.70
Sanding 21 h 47 min $1,786.23
Edging 16 h 43 min $1,471.07
Job details
Making
52261-11 Birch
Batch
B-260174
Raised
23 Jul 2026
Due
31 Aug 2026
Completed
13 Aug 2026
Planned time
126 h
Booked time
141 h 48 min + 13%
Owner
Dave Kuiper