LSG
LSG
WO-2026-0025 · Single Sofa Seat – Sage Demo Upholstery · batch B-260165
xero synced 9:14 am 17 Aug 2026

WO-2026-0025

On the bench Upholstery

10 × Single Sofa Seat – Sage · replenishment for the shelf

← Board
Planned Cut & machined On the bench Finishing Complete Due 14 Sep 2026 · in 28 days
Pick list — 10 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
CodeMaterialRequired IssuedOn hand Unit costLine cost
MAT-BP18-BB Birch plywood 2440×1220 × 18mm BB/BB 10 sheet 10 166 $218.50 $2,185.00
UPH-FOAM-75 Upholstery foam 75mm, per m² 16 m2 16 353.4 $53.50 $856.00
UPH-FOAM-50 Upholstery foam 50mm, per m² 9 m2 9 226.3 $41.20 $370.80
UPH-FAB-SG Upholstery fabric, sage — per lineal m 28 lm 28 161 $68.90 $1,929.20
HW-CONF-50 Confirmat screw 7×50 400 ea 400 12,195 $0.18 $72.00
HW-GLIDE Felt glide, screw-in 40 ea 40 644 $0.95 $38.00
PKG-CTN-L Carton, large, double wall 10 ea 10 754 $7.20 $72.00
PKG-WRAP Stretch wrap, per roll 0.5 roll 0.5 29.3 $21.50 $10.75
Materials $5,533.75
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
WhenWhoBenchAt stageMinutesRate / hCost
10 Aug 2026, 9:55 am Anahera Wilson Sanding On the bench 404 $82.00 $552.13
10 Aug 2026, 12:10 pm Jess Mattingly CNC Router Cut & machined 780 $115.00 $1,495.00
12 Aug 2026, 3:30 pm Pete Rasmussen Edging Cut & machined 337 $88.00 $494.27
14 Aug 2026, 9:10 am Bruce Cadwallader Upholstery On the bench 836 $96.00 $1,337.60
Total 2,357 $3,879.00
What this actually costs to make
Materials plus the bench time, per unit
$941.28
each, over 10 in this batch
Materials
$5,533.75
Booked labour
$3,879.00
Batch cost
$9,412.75
List price each $639.00
Margin each -$302.28 · -47%

The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.

Where the time went
CNC Router 13 h $1,495.00
Upholstery 13 h 56 min $1,337.60
Sanding 6 h 44 min $552.13
Edging 5 h 37 min $494.27
Job details
Making
51314-11 Sage
Batch
B-260165
Raised
27 Jul 2026
Due
14 Sep 2026
Planned time
43 h 20 min
Booked time
39 h 17 min -9%
Owner
Dave Kuiper