WO-2026-0023 · Discovery Bench with Tubs – Sage Demo Assembly · batch B-260163
xero synced 9:14 am 17 Aug 2026

WO-2026-0023

On the bench Assembly

4 × Discovery Bench with Tubs – Sage · for SO-2026-0398 (Greymouth Main School)

← Board
Planned Cut & machined On the bench Finishing Complete Due 07 Sep 2026 · in 21 days
Pick list — 4 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
CodeMaterialRequired IssuedOn hand Unit costLine cost
MAT-BP18-BB Birch plywood 2440×1220 × 18mm BB/BB 4.8 sheet 4.8 166 $218.50 $1,048.80
MAT-BP12-BB Birch plywood 2440×1220 × 12mm BB/BB 2 sheet 2 15 $152.00 $304.00
MAT-BIR-EDG Birch edging tape 22mm, per lineal m 60 lm 60 2,011 $2.95 $177.00
FIN-OIL-SG Hardwax oil, sage tint — per litre 1.48 L 1.48 64 $68.50 $101.38
FIN-SAND-120 Abrasive belt 120 grit 2.56 ea 2.56 29 $8.90 $22.78
HW-CONF-50 Confirmat screw 7×50 100 ea 100 12,195 $0.18 $18.00
HW-GLIDE Felt glide, screw-in 28 ea 28 644 $0.95 $26.60
PKG-CTN-L Carton, large, double wall 4 ea 4 754 $7.20 $28.80
PKG-CORNER Corner board, per lineal m 16 lm 16 1,362 $0.85 $13.60
Materials $1,740.96
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
WhenWhoBenchAt stageMinutesRate / hCost
07 Aug 2026, 10:00 am Anahera Wilson Sanding On the bench 120 $82.00 $164.00
13 Aug 2026, 1:45 pm Jess Mattingly CNC Router Cut & machined 342 $115.00 $655.50
17 Aug 2026, 7:35 am Cam Bishop Assembly On the bench 294 $94.00 $460.60
17 Aug 2026, 1:25 pm Pete Rasmussen Edging Cut & machined 107 $88.00 $156.93
Total 863 $1,437.03
What this actually costs to make
Materials plus the bench time, per unit
$794.50
each, over 4 in this batch
Materials
$1,740.96
Booked labour
$1,437.03
Batch cost
$3,177.99
List price each $798.00
Margin each $3.50 · 0%

The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.

Where the time went
CNC Router 5 h 42 min $655.50
Assembly 4 h 54 min $460.60
Sanding 2 h $164.00
Edging 1 h 47 min $156.93
Job details
Making
52418-12 Sage
Batch
B-260163
Raised
31 Jul 2026
Due
07 Sep 2026
Planned time
17 h
Booked time
14 h 23 min -15%
Owner
Dave Kuiper