WO-2026-0018 · Cove Fluted Bench – Oak Demo Assembly · batch B-260158
xero synced 9:14 am 17 Aug 2026

WO-2026-0018

Cut & machined Assembly

13 × Cove Fluted Bench – Oak · for SO-2026-0398 (Greymouth Main School)

← Board
Planned Cut & machined On the bench Finishing Complete Due 24 Aug 2026 · in 7 days
Pick list — 13 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
CodeMaterialRequired IssuedOn hand Unit costLine cost
MAT-BP18-BB Birch plywood 2440×1220 × 18mm BB/BB 10.4 sheet 10.4 166 $218.50 $2,272.40
MAT-OAK-EDG Oak edging tape 22mm, per lineal m 130 lm 130 2,165 $3.40 $442.00
MAT-OAK-VEN European oak veneer, 0.6mm, per m² 15.6 m2 15.6 315 $38.50 $600.60
MAT-FLUTE Fluted oak panel 2400×1200, per sheet 3.9 sheet 3.9 13 $324.00 $1,263.60
FIN-OIL-CL Hardwax oil, clear, low-tox — per litre 3.12 L 3.12 79.43 $62.50 $195.00
FIN-SAND-120 Abrasive belt 120 grit 5.33 ea 5.33 29 $8.90 $47.44
HW-CONF-50 Confirmat screw 7×50 169 ea 169 12,195 $0.18 $30.42
HW-GLIDE Felt glide, screw-in 78 ea 78 644 $0.95 $74.10
PKG-CTN-M Carton, medium, double wall 13 ea 13 1,057 $4.80 $62.40
PKG-CORNER Corner board, per lineal m 39 lm 39 1,362 $0.85 $33.15
Materials $5,021.11
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
WhenWhoBenchAt stageMinutesRate / hCost
11 Aug 2026, 11:10 am Pete Rasmussen Edging Cut & machined 240 $88.00 $352.00
17 Aug 2026, 12:25 pm Jess Mattingly CNC Router Cut & machined 653 $115.00 $1,251.58
Total 893 $1,603.58
What this actually costs to make
Materials plus the bench time, per unit
$509.59
each, over 13 in this batch
Materials
$5,021.11
Booked labour
$1,603.58
Batch cost
$6,624.69
List price each $470.00
Margin each -$39.59 · -8%

The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.

Where the time went
CNC Router 10 h 53 min $1,251.58
Edging 4 h $352.00
Job details
Making
51153-11 Oak
Batch
B-260158
Raised
11 Aug 2026
Due
24 Aug 2026
Planned time
35 h 45 min
Booked time
14 h 53 min -58%
Owner
Dave Kuiper