WO-2026-0010 · Willow Single Sofa – Oak Demo Upholstery · batch B-260150
xero synced 9:14 am 17 Aug 2026

WO-2026-0010

Planned Upholstery

15 × Willow Single Sofa – Oak · for SO-2026-0399 (Kadimah School)

← Board
Planned Cut & machined On the bench Finishing Complete Due 01 Sep 2026 · in 15 days
Pick list — 15 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
CodeMaterialRequired IssuedOn hand Unit costLine cost
MAT-BP18-BB Birch plywood 2440×1220 × 18mm BB/BB 16.5 sheet 166 $218.50 $3,605.25
UPH-FOAM-75 Upholstery foam 75mm, per m² 28.5 m2 353.4 $53.50 $1,524.75
UPH-FOAM-50 Upholstery foam 50mm, per m² 15 m2 226.3 $41.20 $618.00
UPH-FAB-OAT Upholstery fabric, oat — per lineal m 49.5 lm 108.4 $68.90 $3,410.55
HW-CONF-50 Confirmat screw 7×50 270 ea 12,195 $0.18 $48.60
HW-GLIDE Felt glide, screw-in 105 ea 644 $0.95 $99.75
PKG-CTN-L Carton, large, double wall 15 ea 754 $7.20 $108.00
PKG-WRAP Stretch wrap, per roll 0.75 roll 29.3 $21.50 $16.13
Materials $9,431.03
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
WhenWhoBenchAt stageMinutesRate / hCost
No bench time booked yet. Advance the job on the board, or book it here.
What this actually costs to make
Materials plus the bench time, per unit
$628.74
each, over 15 in this batch
Materials
$9,431.03
Booked labour
$0.00
Batch cost
$9,431.03
List price each $756.00
Margin each $127.27 · 17%

The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.

Job details
Making
51203-12 Oak
Batch
B-260150
Raised
29 Jul 2026
Due
01 Sep 2026
Planned time
75 h
Booked time
Owner
Dave Kuiper