LSG
LSG
WO-2026-0002 · Admin Desk — 1600 – Birch Demo Assembly · batch B-260142
xero synced 9:14 am 17 Aug 2026

WO-2026-0002

Cut & machined Assembly

9 × Admin Desk — 1600 – Birch · for SO-2026-0403 (Napier Central School)

← Board
Planned Cut & machined On the bench Finishing Complete Due 01 Oct 2026 · in 45 days
Pick list — 9 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
CodeMaterialRequired IssuedOn hand Unit costLine cost
MAT-BP18-BB Birch plywood 2440×1220 × 18mm BB/BB 15.3 sheet 15.3 166 $218.50 $3,343.05
MAT-BP12-BB Birch plywood 2440×1220 × 12mm BB/BB 7.2 sheet 7.2 15 $152.00 $1,094.40
MAT-BP06-BB Birch plywood 2440×1220 × 6mm BB/BB 5.4 sheet 5.4 9 $86.00 $464.40
MAT-BIR-EDG Birch edging tape 22mm, per lineal m 189 lm 189 2,011 $2.95 $557.55
FIN-OIL-CL Hardwax oil, clear, low-tox — per litre 4.68 L 4.68 79.43 $62.50 $292.50
FIN-SAND-120 Abrasive belt 120 grit 8.1 ea 8.1 29 $8.90 $72.09
HW-CONF-50 Confirmat screw 7×50 171 ea 171 12,195 $0.18 $30.78
HW-KNOB-OAK Turned oak knob 32mm 36 ea 36 109 $4.30 $154.80
HW-RUN-450 Drawer runner, soft-close, 450mm pair 18 pr 18 167 $24.80 $446.40
HW-GLIDE Felt glide, screw-in 72 ea 72 644 $0.95 $68.40
PKG-CTN-L Carton, large, double wall 9 ea 9 754 $7.20 $64.80
PKG-CORNER Corner board, per lineal m 54 lm 54 1,362 $0.85 $45.90
Materials $6,635.07
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
WhenWhoBenchAt stageMinutesRate / hCost
07 Aug 2026, 9:00 am Jess Mattingly CNC Router Cut & machined 1,038 $115.00 $1,989.50
07 Aug 2026, 12:25 pm Pete Rasmussen Edging Cut & machined 458 $88.00 $671.73
Total 1,496 $2,661.23
What this actually costs to make
Materials plus the bench time, per unit
$1,032.92
each, over 9 in this batch
Materials
$6,635.07
Booked labour
$2,661.23
Batch cost
$9,296.30
List price each $1,183.00
Margin each $150.08 · 13%

The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.

Where the time went
CNC Router 17 h 18 min $1,989.50
Edging 7 h 38 min $671.73
Job details
Making
52434-12 Birch
Batch
B-260142
Raised
14 Aug 2026
Due
01 Oct 2026
Planned time
54 h
Booked time
24 h 56 min -54%
Owner
Dave Kuiper