WO-2026-0013
Cut & machined Assembly6 × Art & Discovery Easel — Double – Sage · for SO-2026-0400 (St Andrew's College)
Planned › Cut & machined › On the bench › Finishing › Complete
Due 24 Aug 2026 · in 7 days
Pick list — 6 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
| Code | Material | Required | Issued | On hand | Unit cost | Line cost |
|---|---|---|---|---|---|---|
| MAT-BP18-BB | Birch plywood 2440×1220 × 18mm BB/BB | 4.8 sheet | 4.8 | 166 | $218.50 | $1,048.80 |
| MAT-BIR-EDG | Birch edging tape 22mm, per lineal m | 66 lm | 66 | 2,011 | $2.95 | $194.70 |
| FIN-OIL-SG | Hardwax oil, sage tint — per litre | 1.56 L | 1.56 | 64 | $68.50 | $106.86 |
| FIN-SAND-120 | Abrasive belt 120 grit | 2.7 ea | 2.7 | 29 | $8.90 | $24.03 |
| HW-CONF-50 | Confirmat screw 7×50 | 156 ea | 156 | 12,195 | $0.18 | $28.08 |
| HW-GLIDE | Felt glide, screw-in | 24 ea | 24 | 644 | $0.95 | $22.80 |
| PKG-CTN-M | Carton, medium, double wall | 6 ea | 6 | 1,057 | $4.80 | $28.80 |
| PKG-CORNER | Corner board, per lineal m | 18 lm | 18 | 1,362 | $0.85 | $15.30 |
| Materials | $1,469.37 | |||||
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
| When | Who | Bench | At stage | Minutes | Rate / h | Cost |
|---|---|---|---|---|---|---|
| 17 Aug 2026, 10:05 am | Wiremu Ngata | CNC Router | Cut & machined | 394 | $115.00 | $755.17 |
| 17 Aug 2026, 2:40 pm | Pete Rasmussen | Edging | Cut & machined | 154 | $88.00 | $225.87 |
| Total | 548 | $981.04 | ||||
What this actually costs to make
Materials plus the bench time, per unit
$408.40
each, over 6 in this batch
- Materials
- $1,469.37
- Booked labour
- $981.04
- Batch cost
- $2,450.41
List price each $577.00
Margin each $168.60 · 29%
The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.
Where the time went
| CNC Router | 6 h 34 min | $755.17 |
| Edging | 2 h 34 min | $225.87 |
Job details
- Making
- 52385-12 Sage
- Batch
- B-260153
- Raised
- 29 Jul 2026
- Due
- 24 Aug 2026
- Planned time
- 18 h
- Booked time
- 9 h 8 min -49%
- Owner
- Dave Kuiper
Book bench time
Costed at the rate of the bench that did the work.