WO-2026-0011
Planned Assembly9 × Kete Open Shelf Unit – Birch · for SO-2026-0392 (Victory Primary School)
Planned › Cut & machined › On the bench › Finishing › Complete
Due 07 Sep 2026 · in 21 days
Pick list — 9 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
| Code | Material | Required | Issued | On hand | Unit cost | Line cost |
|---|---|---|---|---|---|---|
| MAT-BP18-BB | Birch plywood 2440×1220 × 18mm BB/BB | 9 sheet | — | 166 | $218.50 | $1,966.50 |
| MAT-BP12-BB | Birch plywood 2440×1220 × 12mm BB/BB | 3.6 sheet | — | 15 | $152.00 | $547.20 |
| MAT-BIR-EDG | Birch edging tape 22mm, per lineal m | 108 lm | — | 2,011 | $2.95 | $318.60 |
| FIN-OIL-CL | Hardwax oil, clear, low-tox — per litre | 2.79 L | — | 79.43 | $62.50 | $174.38 |
| FIN-SAND-120 | Abrasive belt 120 grit | 4.77 ea | — | 29 | $8.90 | $42.45 |
| HW-CONF-50 | Confirmat screw 7×50 | 144 ea | — | 12,195 | $0.18 | $25.92 |
| HW-GLIDE | Felt glide, screw-in | 36 ea | — | 644 | $0.95 | $34.20 |
| PKG-CTN-M | Carton, medium, double wall | 9 ea | — | 1,057 | $4.80 | $43.20 |
| PKG-CORNER | Corner board, per lineal m | 36 lm | — | 1,362 | $0.85 | $30.60 |
| Materials | $3,183.05 | |||||
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
| When | Who | Bench | At stage | Minutes | Rate / h | Cost |
|---|---|---|---|---|---|---|
| No bench time booked yet. Advance the job on the board, or book it here. | ||||||
What this actually costs to make
Materials plus the bench time, per unit
$353.67
each, over 9 in this batch
- Materials
- $3,183.05
- Booked labour
- $0.00
- Batch cost
- $3,183.05
List price each $626.00
Margin each $272.33 · 44%
The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.
Job details
- Making
- 51921-11 Birch
- Batch
- B-260151
- Raised
- 10 Aug 2026
- Due
- 07 Sep 2026
- Planned time
- 31 h 30 min
- Booked time
- —
- Owner
- Dave Kuiper
Book bench time
Costed at the rate of the bench that did the work.