WO-2026-0003 · Kete Bag Locker — 8 Bay – Oak Demo Assembly · batch B-260143
xero synced 9:14 am 17 Aug 2026

WO-2026-0003

Cut & machined Assembly

3 × Kete Bag Locker — 8 Bay – Oak · for SO-2026-0404 (Epsom Normal Primary School)

← Board
Planned Cut & machined On the bench Finishing Complete Due 31 Aug 2026 · in 14 days
Pick list — 3 off the bill of material
Every quantity here is the bill multiplied out. Running the build takes them out of stock.
CodeMaterialRequired IssuedOn hand Unit costLine cost
MAT-BP18-BB Birch plywood 2440×1220 × 18mm BB/BB 4.2 sheet 4.2 166 $218.50 $917.70
MAT-BP12-BB Birch plywood 2440×1220 × 12mm BB/BB 2.1 sheet 2.1 15 $152.00 $319.20
MAT-OAK-EDG Oak edging tape 22mm, per lineal m 54 lm 54 2,165 $3.40 $183.60
MAT-OAK-VEN European oak veneer, 0.6mm, per m² 7.2 m2 7.2 315 $38.50 $277.20
FIN-OIL-CL Hardwax oil, clear, low-tox — per litre 1.38 L 1.38 79.43 $62.50 $86.25
FIN-SAND-120 Abrasive belt 120 grit 2.37 ea 2.37 29 $8.90 $21.09
HW-CONF-50 Confirmat screw 7×50 45 ea 45 12,195 $0.18 $8.10
HW-HNG-SC Soft-close concealed hinge 110° 18 ea 18 672 $6.85 $123.30
HW-GLIDE Felt glide, screw-in 12 ea 12 644 $0.95 $11.40
PKG-CTN-L Carton, large, double wall 3 ea 3 754 $7.20 $21.60
PKG-CORNER Corner board, per lineal m 15 lm 15 1,362 $0.85 $12.75
Materials $1,982.19
Bench time booked
Each booking costs at the rate of the bench that did the work — CNC is dearer than sanding
WhenWhoBenchAt stageMinutesRate / hCost
10 Aug 2026, 4:30 pm Pete Rasmussen Edging Cut & machined 108 $88.00 $158.40
17 Aug 2026, 9:55 am Jess Mattingly CNC Router Cut & machined 305 $115.00 $584.58
Total 413 $742.98
What this actually costs to make
Materials plus the bench time, per unit
$908.39
each, over 3 in this batch
Materials
$1,982.19
Booked labour
$742.98
Batch cost
$2,725.17
List price each $1,032.00
Margin each $123.61 · 12%

The materials half comes off the bill on its own. The labour half only exists because the time is booked against the job as it moves — without it, the cost of a piece is the plywood and nothing else.

Where the time went
CNC Router 5 h 5 min $584.58
Edging 1 h 48 min $158.40
Job details
Making
51944-12 Oak
Batch
B-260143
Raised
13 Aug 2026
Due
31 Aug 2026
Planned time
15 h 45 min
Booked time
6 h 53 min -56%
Owner
Dave Kuiper